New Projects are Kicked Off in The Chemicals and Alternative Energy Realms
Recently we have kicked off the two new investment projects. Both of them are zero-ground projects. One is in the realm of agroecology and chemicals.
The project has been incepted in Ukraine by the privately owned company “Eco-Project”. The key project goal is to establish an innovative company to produce mineral fertilizers and sorbents of new generation, produced using the patented biotechnology. The project also assumes creation of export-oriented business with the key target markets of Europe, Asia and Africa, preceded with development of domestic market.
The key products are mineral fertilizers and sorbents. The first can be used to recover agroecological balance of land resources, to improve soil fertility and to restore biocenose of water bodies. These subjects become actual, considering the current environmental state, growing Earth population, polution and degradation of water sources.
The second product can be used to absorb oil and petroleum products. Also it can be used to absorb greenhouse gases, N2O in particular and it is adapted to the ecological program of Kyoto agreement. Though the share of N2O in the greenhouse gases pie is not so high, comparing with CO2, we must not forget that even a small breach can sink a ship. Sometimes the greater problem can be mitigated by solving the smaller one.
The second project is in the alternative energy realm and it has the ultimate goal to organize the production of new zero-emission power generating systems based on the new patented EAP/DE technology. The working principle is based on the research work, conducted on smart materials for robotics artificial muscles.
The technology has been invented and patented by Prof. Dr. F. Dakhil, who manages the “Thermo-Dynamic Propulsion Systems” company (TDPS). The key products of the company are zero-emission, high-energy-density EAP/DE power generator, CO2 capturing and power generating device based on wind and tidal energy, as well as devices that can be used in electric vehicles and boats.
In the current first stage, after more that 7 years of R&D undertakings, the project requires funding to finish the construction of working prototype, being conducted in Germany, which will be used to demonstrate the product to the select interested parties.
The summaries of both of the projects are available on the “Projects” page.

Viadeo